odoo.fast

Odoo for precast concrete: moulds, pours, cure times and yard stock, planned.

For plants casting panels, beams, pipes, culverts and blocks, where the mould is the bottleneck, the cure time is fixed by the concrete, and the yard holds weeks of stock waiting for a truck.

Book a scoping callManufacturing
A gloved worker in a high visibility vest stacking hollow precast concrete blocks in a yard.
Photo by Héctor Emilio Gonzalez on Unsplash

Where it breaks today.

  • Mould availability decides what can be poured tomorrow, and it is planned on a whiteboard that only the yard foreman can read.

  • Each element needs its own mark number and cast date, and finding a specific panel in a five hectare yard takes an hour.

  • Cement, aggregate and admixture are consumed by the cubic metre per mix design, and the cost per element is worked out once a year by the accountant.

  • Cube test results live in the lab's spreadsheet, so releasing an element for delivery depends on a phone call.

How we set it up.

Configured for precast concrete, on a staging database you can log into, with a demo every week.

  • Moulds as work centres

    Each mould or bed is a work centre with one pour per day of capacity. Routings run pour, cure, strip and finish, so the planner sees mould load weeks ahead.
  • Mix designs as bills of materials

    Every mix design is a BoM per cubic metre of cement, aggregate, water and admixture. The element BoM consumes cubic metres of that mix plus reinforcement and cast-in items.
  • Serials per element with cast date

    Each panel or beam carries a serial holding the mark number, cast date and mould. The yard is mapped as locations by row and bay, so the loader finds the element first time.
  • Cure time as a fixed duration

    The cure operation has a fixed duration in the routing, so strip and finish are scheduled after it and the mould is freed on time for the next pour.
  • Test results release the element

    Quality control points on the pour capture slump and cube results at 7 and 28 days. The element stays in a quality location until the pass is recorded.

The apps.

Official Odoo apps, one database. Licences are paid to Odoo directly and are not marked up.

  • Manufacturing
    Bills of materials, work orders, costing.
  • Inventory
    Receipts, deliveries, transfers, valuation.
  • Quality
    Checks, alerts, control points.
  • Sales
    Quotes, orders, e-signature, upsells.
  • Purchase
    RFQs, vendor pricing, reordering.
  • Maintenance

By region.

Where our teams sit, and what changes for this industry in each place.

  • Dubai

    Cast-in items and steel are often imported into a free zone plant while elements go to mainland contractors, handled as two companies with intercompany transfers. Progress invoices carry 5% VAT and are ready for e-invoicing from 2026 to 2027.

  • United States

    Sales tax on precast depends on the state and on whether the plant also installs, so fiscal positions are set per project with your accountant. Heavy haulage is recorded on the delivery order for freight billing.

  • Melbourne

    Test certificates attach to the element serial for the engineer's records, and GST and the BAS come from the ledger. Yard and batching staff wages run through STP Phase 2 in the same system.

Questions about Odoo for precast concrete.

Each mould is a work centre with a capacity, and the planning view shows what is booked. Manufacturing orders are scheduled into free mould days rather than piled up on one bed.

Something else? Ask it here.

Answered from what we publish. Anything it cannot answer goes to a person on WhatsApp.

Enter sends.0/300

Prefer email? hello@odoo.fast

Scoped in 48 hours. Live on a date we sign.

Odoo fortrading companieslive in weeks, on a date we sign.

Send us your current setup. Within 48 hours you get a fixed price, a module list and a go-live date, from one senior team that does nothing but Odoo.