odoo.fast

Odoo for mattress manufacturing: foam, springs, fabric and size variants, made to order.

For factories building pocket spring, foam and hybrid mattresses in every bed size for retailers, hotels and online buyers, who need one bill of materials per model rather than one per size.

Book a scoping callManufacturing
A finished quilted mattress on a factory floor with a tape edge machine and operator out of focus behind it.
Photo by DLX Mattress on Unsplash

Where it breaks today.

  • A model comes in six sizes and three firmness levels, and each one has been set up as its own product with its own half-correct bill of materials.

  • Foam is bought as blocks and cut into layers, quilted panels are made ahead, and the stock of half-made components is invisible until the line stops.

  • Hotel contracts want 200 units delivered over three months, and the schedule is a spreadsheet emailed to the floor.

  • The cost of a king mattress is a rough average that has not been updated since the last foam price rise.

How we set it up.

Configured for mattress manufacturing, on a staging database you can log into, with a demo every week.

  • One BoM per model

    Size and firmness are product attributes. The bill of materials uses attribute-based lines, so the king consumes the king spring unit and border while the single consumes its own.
  • Quilted panels as sub-assemblies

    Quilting produces panel sub-assemblies on their own manufacturing orders with reordering rules by size. Final assembly consumes them, and the panel stock is real.
  • Quilting, tape edge and packing routings

    Work centres for quilting, spring assembly, foam lamination, tape edge and packing with time per operation. Capacity on the tape edge machine drives the daily plan.
  • Hotel orders on a schedule

    A contract order with staged delivery dates creates manufacturing orders per delivery, so the floor builds what is due next and the buyer sees a date.
  • Foam blocks cut into layers

    Foam is bought by the block in cubic metres and converted into layers by a cutting BoM. Average costing carries the foam price rise through to the finished unit.

The apps.

Official Odoo apps, one database. Licences are paid to Odoo directly and are not marked up.

  • Manufacturing
    Bills of materials, work orders, costing.
  • Sales
    Quotes, orders, e-signature, upsells.
  • Inventory
    Receipts, deliveries, transfers, valuation.
  • Purchase
    RFQs, vendor pricing, reordering.
  • eCommerce
    Your store on the same database.
  • Accounting
    Invoices, bills, bank feeds, tax returns.

By region.

Where our teams sit, and what changes for this industry in each place.

  • Dubai

    Hotel projects dominate, with staged deliveries to several properties on a single purchase order, handled as one sales order with scheduled delivery lines. Invoices carry 5% VAT and are built for the e-invoicing mandate arriving in 2026 and 2027.

  • United States

    Mattresses carry flammability standard and law label requirements, so the label content and test references sit on the product for the packing station. Tax follows the ship-to state, and retailer resale certificates are stored on the customer.

  • Melbourne

    Product standard references attach to the product record for retailer paperwork, and GST and the BAS come from the ledger. Factory wages with shift allowances run through STP Phase 2 payroll.

Questions about Odoo for mattress manufacturing.

No. One product per model with size and firmness attributes generates the variants, and one bill of materials with attribute-based lines covers all of them.

Something else? Ask it here.

Answered from what we publish. Anything it cannot answer goes to a person on WhatsApp.

Enter sends.0/300

Prefer email? hello@odoo.fast

Scoped in 48 hours. Live on a date we sign.

Odoo fortrading companieslive in weeks, on a date we sign.

Send us your current setup. Within 48 hours you get a fixed price, a module list and a go-live date, from one senior team that does nothing but Odoo.